Baer Manufacturing – Georgetown Facility
The Project
- 618,560-square-foot build-to-suit industrial facility at Crosspoint Phase II with cross-dock configuration and 40-foot clear height
- Approximately 25,000 square feet of two-story office space
- Fully air-conditioned warehouse for temperature and humidity control
- Loading docks on both sides of the building and oversized drive-through doors accommodating 53-foot trucks
- Fully fenced and secured site
- Georgetown, TX
Tegra Leadership
- Owner’s representation and comprehensive project management for design and construction
- Project schedule and budget management
- Project team assembly and contract negotiations
- Coordination of base building and tenant improvements, including office space, warehouse systems and infrastructure